Delaware Basin Operator Eliminated 8.4 Drilling Days With Real-Time Performance Monitoring

One of our Delaware Basin operators eliminated 8.4 drilling days with real-time performance monitoring to increase efficiency. This record consisted of a 2-mile lateral spud to TD/RR while drilling 32% faster than the previous area average spud to TD and 29% faster than the previous area average spud to RR. Utilizing GT-MWD technology and drilling 10,735 […]

Delaware Basin Operator Eliminated 8.4 Drilling Days With Real-Time Performance Monitoring Read More »