One of our Delaware Basin operators eliminated 8.4 drilling days with real-time performance monitoring to increase efficiency. This record consisted of a 2-mile lateral spud to TD/RR while drilling 32% faster than the previous area average spud to TD and 29% faster than the previous area average spud to RR. Utilizing GT-MWD technology and drilling 10,735 ft with one BHA, 100% of the lateral footage was drilled in the reservoir.
Congratulations to our operator and the Legacy Directional Drilling, LLC. and Gordon Technologies teams!