Austin Chalk First Ever VCL

Date

Date

A major operator drilled the first Austin Chalk one-run vertical/curve/lateral. The list of milestones on this well was long but included the fastest spud to TD and highest overall feet/day. Congrats to everyone involved including field experts David Mejorado, Jose Rodriguez, and KLX Energy Services directional team. Gordon is proud to have engineered our industry’s most robust and reliable MWD system.

#MWD
#AustinChalk

More
articles

Scroll to Top