Customer Testimonial
At Gordon Technologies, we thrive on exceeding our customers’ expectations. Thank you Mike Saur at Laredo Energy for the opportunity to demonstrate our performance and reliability.
Customer Testimonial Read More »
At Gordon Technologies, we thrive on exceeding our customers’ expectations. Thank you Mike Saur at Laredo Energy for the opportunity to demonstrate our performance and reliability.
Customer Testimonial Read More »
Chris Lapoint, COO, and Martin Campbell, NA Sales Manager, participated in the Destination Oilmen’s Golf Invitational, taking home the 2nd place trophy. A portion of all proceeds raised from the tournament was donated to the Children’s Heart Foundation. Thank you to board members, and Jeremy Adrian, P.E., President of DOGI, for connecting industry professionals from multiple basins for
“Dropping a basin record 27,520’ MD and 15,240’ completable lateral well in Sabine Parish seems like a fitting end to the culmination of our Vine drilling team’s accomplishments. I truly believe our team has left their fingerprints all over the Haynesville with a lot of our operational advancements creating real step-change improvements for many of our
Haynesville Record – Longest Well & Longest Lateral Read More »
The 20 ksi, 175 C-rated PWD tool is designed to deliver real-time and memory measurements of Annular Pressure (including Max/Min), Drill Pipe Pressure (including Max/Min), and Annular Temperature. Pressure logs assist operators in diagnosing bit failures, picking up mud motor stalls, and measuring the effects of cuttings on mud weight in hole. ECD for all
Pressure While Drilling Success in Karnes County, TX Read More »
Gordon’s proprietary PWD system was recently deployed in South Texas for a major operator. The GT-MWD + PWD delivered high-density data enabling optimized mud weights for faster ROP, wellbore stability, and proper hole cleaning.
PWD System Recently Deployed in South Texas Read More »
Congratulations to GeoSouthern on drilling the longest Austin Chalk well to date in Washington County, TX. (See Post) This record well reached a high temperature of 378°F utilizing Gordon’s Heat Miser™ MWD system. The GT-MWD high-temperature tool offers an innovative design that greatly enhances the performance of MWD tools and also protects the equipment from
Longest Austin Chalk Well to Date Read More »